Result descriptionThe EASY-RES ICT system provides: 1. Dashboard used for monitoring, visualization of measurement data, and accepting AS requests from TSO/DSO. 2.
Innovation Offers
Result descriptionFor each AS the capital and operational costs have been identified. Examples: the capital cost for the required ultracapacitor
Result descriptionIt is a series of specifications on how to measure and quantiy a number of AS that are offered
Result descriptionFor a given distribution grid topology, forecasted RES power, and known dynamic capabilities of the DRES (inertial response, frequency
Result descriptionThe methodology calculates the DRES/BESS within a distribution grid that are well positioned and suitably loaded and sends them
Result description Supposing that several DRES have the ability to provide true inertial response with controllable time constant (H), up
Result description The methodology is based on the identification of the most suitable DRES to exchange reactive power to regulate
Result description The testbed achieves secure communication with Distributed Renewable Energy Sources (DRES) via the use of a fast and
Result description This methodology can control the reaction of Distributed Renewable Energy Sources (DRES) during faults in the distribution grid
Result description The methodology enables the evaluation of the required size of a BESS installed at the interconnection of a
Result descriptionCo-creation is usually operationalised using the similar steps from co-design to co-deployment and monitoring. Yet, the environmental, as well
Result description The agent-based model can be used to analyse and improve upstream fish migration facilities, which is a crucial












