The Dual HIL testing scheme combines together two HIL equipped rigs that see two different WEC subsystems simultaneously under test. This novel setup allows to test at the subsystems’ levels while addressing their influence at a global WEC level through the numerical model, introducing a fidelity previously unseen in wave energy research. In particular, prime mover, Power Take-off (PTO) and moorings are the components usually under stress: the key load paths transferred from the wave to the drivetrain and finally to the mooring/ballast/fixed structure can be studied. This novel setup allows to identify and significantly reduce the probability of possible mechanical and electrical failures resulting from components interaction.
By informing key modules to describe in detail the settings of subsystems and inter-dependencies, the inclusion of the main subsystems’ characteristics in the numerical model will be beneficial for the identification of key aspects such as efficiency, reliability, survivability and techno-economic. These features, which are not possible to be quantified in small scale tests, will inform the WEC design process in the future development steps.

