While significant research has been done on optimising tree-configurations array cables for offshore windfarms, the design of in-service loop-configuration array cables is sub-optimal. The savings provided by TX Array Cable Optimiser for each windfarm that we tested are listed below. These are expressed as the reduction in total capitalised cost relative to the as-built cost (calculated on the same basis).
1) Rampion: €8.7m
2) Veja Mate: €4.2m
3) London Array: €7.7m
4) Sofia: €9.8m
The success of the TX Array Cable Layout Optimiser on the Sofia windfarm (which is due to become fully operational in 2026), shows that the tool is very effective in optimsing even the most recent windfarms where more optimisation techniques are expected to have been performed.