Funding or Finance Opportunity

Low-disruptive renovation processes using integration of prefabricated solutions for energy-efficient buildings

Low-disruptive renovation processes using integration of prefabricated solutions for energy-efficient buildings

ExpectedOutcome:

Project results are expected to contribute to all of the following expected outcomes:

  • Reduction of on-site construction activities to 1-2 days per dwelling/building unit.
  • Cost reduction of at least 25% compared to conventional renovation processes.
  • Significant reduction of dust, noise and waste on the construction site compared to conventional renovation processes.
  • Significant reduction in occupant disturbance during the renovation.
  • Improved levels of occupancy comfort (e.g. Indoor Air Quality and Indoor Environmental Quality) after renovation.
  • Reduction of negative impacts of renovation on biodiversity, considering adaptability as well (e.g. to climate change, different use, evolving societal needs, etc.) and resilience of buildings to disruptive events.

Scope:

Low-disruptive renovation processes, using prefabricated modules that are quick and easy to apply can play an important role in increasing the renovation rate of the European building stock. Renovation processes should cover the whole workflow from design to offsite manufacture, installation, compliance checking on site and end strategies for maintenance, operation and end of life.

Proposals are expected to address all of the following:

  • Develop streamlined processes for deep energy-efficient renovation to at least NZEB performance levels using prefabricated modules.
  • Use relevant available technologies to reduce quality gaps between the off-site manufacturing and on-site deployment of prefabricated modules.
  • Develop processes for seamless integration of prefabricated solutions into a variety of existing constructions (e.g. various existing wall materials, presence of balconies and overhangs, existing piping in the way etc.).
  • Ensure the processes minimize the disturbance for building owners, tenants and users, through a considerable time reduction of on-site construction activities, reduced impact in terms of the unavailability of the building and its main functionalities, and a minimal impact on occupancy comfort during the renovation process.
  • Include at least three demonstrations covering different building categories (residential or tertiary) and various building typologies, such as single or multi-storey, single or multi-use, etc.
  • Demonstrate less-disruptive retrofitting processes that are more attractive and more cost-effective for building owners, tenants and users.

Specific Topic Conditions:

Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B.

General Information

Call Type
EU Horizon Europe
Eligible Country/ies
EU27 + associated countries for Horizon Europe
Call Identifier (if any)
HORIZON-CL5-2024-D4-01-01
Expected Outcome or Impact
ExpectedOutcome:

Project results are expected to contribute to all of the following expected outcomes:

1. Reduction of on-site construction activities to 1-2 days per dwelling/building unit.
2. Cost reduction of at least 25% compared to conventional renovation processes.
3. Significant reduction of dust, noise and waste on the construction site compared to conventional renovation processes.
4. Significant reduction in occupant disturbance during the renovation.
5. Improved levels of occupancy comfort (e.g. Indoor Air Quality and Indoor Environmental Quality) after renovation.
6. Reduction of negative impacts of renovation on biodiversity, considering adaptability as well (e.g. to climate change, different use, evolving societal needs, etc.) and resilience of buildings to disruptive events.
Target Groups
Research Institutes, Academia, Small- and Medium Enterprises, Industry, Start-Ups
Submission Deadlines
Single fixed deadline
(Next) Submission Deadline
18 April 2024
Type of Funding Instrument
Collaborative Projects / Consortia
Max. funding amount per project [EURO]
5,000,000 €
Overall budget for all projects [EURO]
10,000,000 €

Author Info

John Fahlteich

Member since 2 years ago
View Profile

Ask a question or request support

Low-disruptive renovation processes using integration of prefabricated solutions for energy-efficient buildings 0 reviews

Login to Write Your Review

There are no reviews yet.

Write Your Review

Your email address will not be published. Required fields are marked *